Add Log
Overview
The process to add a log entry can be done through the Project Log Tab of the Diary Window.
Prerequisites
The date for the entry must have passed or be the current date.
The Report must not be signed.
Add Log
To add a log entry:
-
Select the date of the entry.
-
Click on the Add Log Button
-
Click on the Save Button.
To edit the Log entry, the following items are available for the columns in the Project Log table:
-
Type - Click the field or the drop-down arrow and select from the types of log entry in the drop-down
-
Comments - Follow the Append Comment process.
-
... - Follow the Upload Documents process.
Notes
-
The Last Updated By and Last Update fields will automatically be filled.
-
Log Type is a required field.
-
A contract cannot be suspended twice.